                </title><link>/departments/engineering</link><pubDate>2012-05-17T09:23:59</pubDate><generator>Engage by Build My Own Site, Inc. at http://www.buildmyownsite.com</generator><description></description><language>en</language><item><title>Engineering</title><link>/departments/engineering</link><pubDate>2012-05-16T13:22:04</pubDate><dc:creator>kochkk</dc:creator><category></category><guid>/departments/engineering/departments/engineering5f32897ce502f41f84d57dc9b5654c62</guid><description><![CDATA[ 
<p><strong>PROJECT 3-12 "2012 WELHOUSE DRIVE MINI STORM SEWER"
NOTICE TO CONTRACTORS</strong></p>

<p style="text-align: left;">Click <a
href="/media/64979/notice%20to%20contractors.pdf">
here</a> to view the&nbsp;Notice to Contractors&nbsp;of Project
3-12, "2012 Welhouse Drive Mini Storm Sewer". Questions on the
project can be directed to&nbsp;Project Engineer&nbsp;John
Neumeier&nbsp;at 920.766.6305.</p>

<p style="text-align: left;"><strong>PROJECT 1-12 "2012 CONCRETE
STREET PAVING" BID TABULATION</strong></p>

<p style="text-align: left;">Click <a
href="/media/64127/2012%20concrete%20paving%20bid%20tab.pdf">
here</a> to view the bid results of Project 1-12, "Concrete Street
Paving".&nbsp;&nbsp;Questions on the project can be directed
to&nbsp;Senior Project Engineer David Strelcheck at
920.766.6305.</p>

<p style="text-align: left;"><strong>MAIN AVENUE BRIDGE REMOVAL AND
ALTERNATIVES ANALYSIS</strong></p>

<p>The existing bridge was constructed in 1933 and is a two-span,
concrete deck girder bridge with a 55-foot width and 85-foot
overall length.&nbsp; Previous routine bridge inspections have
identified a continued deterioration of the structure.&nbsp; In
November 2011, a detailed bridge inspection was performed of both
the topside and underside of the bridge.&nbsp; This inspection
revealed further deterioration and recommends that the bridge be
removed within the next five years.</p>

<p>Currently, the City is considering that the bridge removal
project be done in conjunction with the reconstruction of the power
canal beginning in 2012.&nbsp; At that time, the power canal will
be off-line and dry.&nbsp; An alternatives analysis for a long term
solution at the bridge location has been completed by the
engineering consultant, GRAEF.</p>

<p>If you have questions about the project, feel free to contact
the City of Kaukauna Engineering Department at 766-6305.</p>

<p>Click <a
href="/media/48582/main%20avenue%20bridge%20exhibit.pdf">
here</a> to view an exhibit from the presentation.</p>
]]></description><content:encoded><![CDATA[ 
<p><strong>PROJECT 3-12 "2012 WELHOUSE DRIVE MINI STORM SEWER"
NOTICE TO CONTRACTORS</strong></p>

<p style="text-align: left;">Click <a
href="/media/64979/notice%20to%20contractors.pdf">
here</a> to view the&nbsp;Notice to Contractors&nbsp;of Project
3-12, "2012 Welhouse Drive Mini Storm Sewer". Questions on the
project can be directed to&nbsp;Project Engineer&nbsp;John
Neumeier&nbsp;at 920.766.6305.</p>

<p style="text-align: left;"><strong>PROJECT 1-12 "2012 CONCRETE
STREET PAVING" BID TABULATION</strong></p>

<p style="text-align: left;">Click <a
href="/media/64127/2012%20concrete%20paving%20bid%20tab.pdf">
here</a> to view the bid results of Project 1-12, "Concrete Street
Paving".&nbsp;&nbsp;Questions on the project can be directed
to&nbsp;Senior Project Engineer David Strelcheck at
920.766.6305.</p>

<p style="text-align: left;"><strong>MAIN AVENUE BRIDGE REMOVAL AND
ALTERNATIVES ANALYSIS</strong></p>

<p>The existing bridge was constructed in 1933 and is a two-span,
concrete deck girder bridge with a 55-foot width and 85-foot
overall length.&nbsp; Previous routine bridge inspections have
identified a continued deterioration of the structure.&nbsp; In
November 2011, a detailed bridge inspection was performed of both
the topside and underside of the bridge.&nbsp; This inspection
revealed further deterioration and recommends that the bridge be
removed within the next five years.</p>

<p>Currently, the City is considering that the bridge removal
project be done in conjunction with the reconstruction of the power
canal beginning in 2012.&nbsp; At that time, the power canal will
be off-line and dry.&nbsp; An alternatives analysis for a long term
solution at the bridge location has been completed by the
engineering consultant, GRAEF.</p>

<p>If you have questions about the project, feel free to contact
the City of Kaukauna Engineering Department at 766-6305.</p>

<p>Click <a
href="/media/48582/main%20avenue%20bridge%20exhibit.pdf">
here</a> to view an exhibit from the presentation.</p>